CLIENT
City of Windsor
LOCATION
Windsor, Ontario
ARCHITECT
HCMA Architects
ENGINEER
Chorley & Bisset
PROJECT TYPE
Design Build
COMPLETION DATE
2013
PROJECT VALUE
$70,000,000
Description
The Windsor International Aquatic and Training Centre is a state-of-the-art aquatics facility. It features a 71m x 25m pool with moveable bulkheads which allows for multiple configurations. The pool features a variable depth setup from 2 to 5 meters to allow for greater flexibility for community use. The Insight Team was responsible for the pursuit, design and construction oversight.
Features
Heating and chilled water provided by central district energy center via heat exchangers
Natatorium and aquatic center are served by indoor constant volume dehumidification units
Waste heat from dehumidification units was utilized to preheat pool water
Air-to-Refrigerant heat exchangers utilized to recapture heat from exhaust to preheat incoming outdoor air